Bay Bridge lane closures extended for week of July 14-20 for maintenance work
Posted by Associated Press on 12th July 2019
| 13 views
link to original article

This post was originally published on ABC2News

MDTA announced the continuation of lane closures on the Bay Bridge for the week of July 14-20.The eastbound span may be closed Sunday from midnight to 5 a.m. Two-way traffic will operate on the westbound span during the full eastbound span closure.The westbound span of the bridge, U.S. 50/301, will close from Monday, July 14 to Wednesday, July 16, beginning at 10 p.m. each day and reopening at 5 a.m. the next morning. The same closure will occur Thursday, July 17, from 11 p.m. to 5a.m. the next morning and Saturday, July 19 from 11 p.m. to 7 a.m. the next morning.Two-way traffic will operate on the eastbound span during the full westbound span closures. One lane of the westbound span may be closed Monday through Wednesday from 9 a.m. to 2:30 p.m. and Thursday from 9 a.m. to 1 p.m. Monday through Thursday, one lane will be closed for approximately 15 minutes for contractor pick-up.MDTA says the best times to travel the Bay Bridge on weekends to the Eastern Shore are:▪ Friday – before 10 a.m. and after 10 p.m. ▪ Saturday – before 7 a.m. and after 5 p.m. ▪ Sunday – before 10 a.m. and after 10 p.m.The closures are so crew can conduct routine preservation and maintenance work and inspections.